Rail Shots Gallery

Railroad Photos

Home > LOCOMOTIVES > DIESEL > EMD
The Waiting....
I take my camera on certain trips...and while waiting for the conductor to return to the head end,I snapped this shot. Coal Power being returned on the 19th of July, on the Z127 to Flint Mi.  This train was over 9100 feet long, and over 17,000 tons
Keywords: bnsf;bn;sd70mac;coal;flint;mi

The Waiting....

I take my camera on certain trips...and while waiting for the conductor to return to the head end,I snapped this shot. Coal Power being returned on the 19th of July, on the Z127 to Flint Mi. This train was over 9100 feet long, and over 17,000 tons

CP9300-5655-278-16.JPG IMG_3807-1rp.jpg IMG_4404-1.jpg IMG_4948-1.jpg yard2-rp.jpg UP_5114_Platteville_Colorado.jpg Aberdeem_NC_Nov_22_2013_007.JPG
Rate this file (No vote yet)