Rail Shots Gallery

Railroad Photos

Home > LOCOMOTIVES > DIESEL > EMD
The Waiting....
I take my camera on certain trips...and while waiting for the conductor to return to the head end,I snapped this shot. Coal Power being returned on the 19th of July, on the Z127 to Flint Mi.  This train was over 9100 feet long, and over 17,000 tons
Keywords: bnsf;bn;sd70mac;coal;flint;mi

The Waiting....

I take my camera on certain trips...and while waiting for the conductor to return to the head end,I snapped this shot. Coal Power being returned on the 19th of July, on the Z127 to Flint Mi. This train was over 9100 feet long, and over 17,000 tons

IMG_0029.JPG CSX_EMD_SD40-2_8007_YN2~0.jpg IMG_6648.JPG z144-1rp.jpg FXE_3204e.jpg WM_EMD_BL2_82.jpg 001.JPG
Rate this file (No vote yet)