Rail Shots Gallery

Railroad Photos

Home > LOCOMOTIVES > DIESEL > EMD
The Waiting....
I take my camera on certain trips...and while waiting for the conductor to return to the head end,I snapped this shot. Coal Power being returned on the 19th of July, on the Z127 to Flint Mi.  This train was over 9100 feet long, and over 17,000 tons
Keywords: bnsf;bn;sd70mac;coal;flint;mi

The Waiting....

I take my camera on certain trips...and while waiting for the conductor to return to the head end,I snapped this shot. Coal Power being returned on the 19th of July, on the Z127 to Flint Mi. This train was over 9100 feet long, and over 17,000 tons

CN-IC_EMD_SD40-3_6255.jpg IMG_3781.JPG FXE_3204e.jpg z144-1rp.jpg IMG_3790.JPG IMG_73041.JPG BLE825.jpg
Rate this file (No vote yet)