Rail Shots Gallery

Railroad Photos

Home > LOCOMOTIVES > DIESEL > EMD
The Waiting....
I take my camera on certain trips...and while waiting for the conductor to return to the head end,I snapped this shot. Coal Power being returned on the 19th of July, on the Z127 to Flint Mi.  This train was over 9100 feet long, and over 17,000 tons
Keywords: bnsf;bn;sd70mac;coal;flint;mi

The Waiting....

I take my camera on certain trips...and while waiting for the conductor to return to the head end,I snapped this shot. Coal Power being returned on the 19th of July, on the Z127 to Flint Mi. This train was over 9100 feet long, and over 17,000 tons

NYSW4006.jpg SP_EMD_SD7R_1537.jpg CR-WB-Stack2.jpg z144-1rp.jpg Aberdeem_NC_Nov_22_2013_003.JPG IMG_8367.JPG NW514001.jpg
Rate this file (No vote yet)