Rail Shots Gallery

Railroad Photos

Home > LOCOMOTIVES > DIESEL > EMD
The Waiting....
I take my camera on certain trips...and while waiting for the conductor to return to the head end,I snapped this shot. Coal Power being returned on the 19th of July, on the Z127 to Flint Mi.  This train was over 9100 feet long, and over 17,000 tons
Keywords: bnsf;bn;sd70mac;coal;flint;mi

The Waiting....

I take my camera on certain trips...and while waiting for the conductor to return to the head end,I snapped this shot. Coal Power being returned on the 19th of July, on the Z127 to Flint Mi. This train was over 9100 feet long, and over 17,000 tons

FXE_3204e.jpg CNW_EMD_GP9R_4499.jpg CO_GE_U23B_2318.jpg CNSD38-21.jpg OHCR_EMD_F40M-2C_452.jpg CR_EMD_SD40-2_6250.jpg P1000123.jpg
Rate this file (No vote yet)