Image search results - "sd70m" |

UP 433412263 viewsUnion Pacific SD70M cab controlsfxe 4600
|
|

BNSF SB Coal Drag15837 viewsBNSF 9611 and 9823 lead a loaded UCEX coal train through Lenexa, Kansas on 7/11/2014. The train is slowly coming to a stop at the signals for the Charlie CP. The train will wait here for traffic ahead to clear before proceeding.gdavies
|
|

SD70M sunrise2626 viewsSD70M sunriseACe
|
|

BNSF Coal Power in Essexville, MI7847 viewsI took this while 'swapping' end on run-thru power. A light snow squall had just startedgtw5812
|
|

Coal Power Holding in the Clear4529 viewsTaken at Bay City, MI, at the 'Mud Switch'gtw5812
|
|

SCMRBE8490 viewsSCMRBE..coal from Wyoming to Roberts Bank,BC coal port.Shot taken at Vader,WA.BCR4601
|
|

CSX SD70MAC #457118201 viewsCSX SD70MAC #4571 sits at CSX Oliver Transfer Yard in Indianapolis as it waits for a crew to take her on her journey. It has been here for about a day or 2 just sitting tied down. It was great to see a MAC still in YN2.', 'CSX, SD, EMD, SD70MAC, Indiana, Indianapolis, trainCSXSD70MAC
|
|

UP 41882495 viewsvisitor in Mexico - 2007
Union Pacific SD70Mfxe 4600
|
|

UP 41883283 viewsvisitor in Mexico - 2007, Union Pacific SD70Mfxe 4600
|
|

UP 43342613 viewsvisitor in Mexico - 2007
Union Pacific SD70Mfxe 4600
|
|

UP 43342805 viewsvisitor in Mexico - 2007
Union Pacific SD70Mfxe 4600
|
|

UP 44757362 viewsvisitor in Mexico. Noe Olivera* Mexico 2006fxe 4600
|
|

Racing Through Platteville...4738 viewsUP 5114(SD70M) is seen racing through Platteville, Colorado, on the ZLADV 10, Los Angeles, California to Denver, Colorado Z-Train, while passing the MNYNP 13.
Copyright 2008 By Denver_ZephyrDenver Zephyr
|
|

The Waiting....6279 viewsI take my camera on certain trips...and while waiting for the conductor to return to the head end,I snapped this shot. Coal Power being returned on the 19th of July, on the Z127 to Flint Mi. This train was over 9100 feet long, and over 17,000 tonsgtw5812
|
|

Backing to the Fuel Pad...8731 viewsWhen we return Coal power light at Flint, sometimes we will take manifest with it. This requires us to pick up some of our own LSRC power, for the return trip north, after dropping the run-thru power. This is our rear unit, which I took while backing to our fuel padgtw5812
|
|

BNSF 9706 on Z1274813 viewsCoal Power being returned on the 19th of July, on the Z127 to Flint Mi. This train was over 9100 feet long, and over 17000 tonsgtw5812
|
|
|
|